濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://m.cannablisscreamery.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁(yè) > 新聞中心 > 公司新聞

你認(rèn)識(shí)木工加工棚嗎?

來(lái)源:http://m.cannablisscreamery.com/   發(fā)布時(shí)間:2023-02-02

木工加工棚采用標(biāo)準(zhǔn)鋼材,雙層防裂設(shè)計(jì),結(jié)構(gòu)牢固穩(wěn)定。組裝齊全,便于運(yùn)輸和基本安裝。它顏色鮮艷,外觀優(yōu)雅。其產(chǎn)品尺寸和顏色可根據(jù)施工現(xiàn)場(chǎng)的實(shí)際要求定制。
The woodworking processing shed is made of national standard steel with double-layer anti-crack design and firm and stable structure. Completely assembled, convenient for transportation and basic installation. It has bright colors and elegant appearance. The product size and color can be customized according to the actual requirements of the construction site.
木工加工棚安裝說(shuō)明:
Installation instructions for woodworking shed:
組件通過(guò)螺栓連接,瓷磚表面通過(guò)自攻釘連接。對(duì)大多數(shù)人來(lái)說(shuō),傳統(tǒng)手工木藝是噪音、空間和可操作性的公約數(shù)。當(dāng)然,從另一個(gè)角度來(lái)看,傳統(tǒng)手工的緩慢有足夠的時(shí)間去觸摸和思考,并且不滿足于一個(gè)想法的實(shí)現(xiàn),將木材制成成品的過(guò)程,然后慢慢加工成木工棚。
The components are connected by bolts, and the ceramic tile surface is connected by self-tapping screws. For most people, traditional handicraft carpentry is the common divisor of noise, space and operability. Of course, from another perspective, the slow pace of traditional handicrafts has enough time to touch and think, and is not satisfied with the realization of an idea. It is the process of making wood into finished products, and then slowly processing it into a wooden shed.
木工加工棚技術(shù)交底:
Safety technical disclosure of woodworking shed:
水平保護(hù)安裝和拆除前,進(jìn)行技術(shù)交底。高空作業(yè)人員經(jīng)過(guò)技術(shù)培訓(xùn)和考試,并持證上崗。加工棚使用的鋼管、扣件等材料符合相關(guān)標(biāo)準(zhǔn)的要求。
Before installation and removal of horizontal protection, safety technical disclosure shall be conducted. High-altitude operators have received professional technical training and professional examination, and take up posts with certificates. The steel pipes, fasteners and other materials used in the processing shed meet the requirements of relevant standards.
安裝和拆除水平加工棚時(shí),操作人員的“三寶”齊全并正確使用。加工棚搭設(shè)和拆除時(shí),應(yīng)避免上下同時(shí)作業(yè),錯(cuò)開(kāi)作業(yè)時(shí)間。
When installing and removing the horizontal processing shed, the operator's "three treasures of safety" are complete and used correctly. When erecting and dismantling the processing shed, it is necessary to avoid simultaneous operation up and down and stagger the operation time.
木工加工棚
安裝和拆除加工棚時(shí),所有材料和工具應(yīng)堆放在建筑物外緣少2m處,堆放高度不得超過(guò)1m。拆除的材料及時(shí)傳遞到地面并運(yùn)走,嚴(yán)禁高空拋擲。建造和拆除加工棚時(shí),應(yīng)在地面上設(shè)置警戒區(qū),并派專人監(jiān)控。
When installing and removing the processing shed, all materials and tools shall be stacked at least 2m away from the outer edge of the building, and the stacking height shall not exceed 1m. The dismantled materials shall be delivered to the ground and transported away in time. Throwing from high altitude is strictly prohibited. When constructing and dismantling the processing shed, a warning area should be set on the ground and a special person should be assigned to monitor it.
建造和拆除加工棚時(shí),應(yīng)指定專人指揮。管理人員應(yīng)注意眼、腿、口,采取有效的防護(hù)措施應(yīng)對(duì)危險(xiǎn)情況,確保人員。
When constructing and dismantling the processing shed, a special person shall be assigned to command. The management personnel shall pay attention to the eyes, legs and mouth, and take effective safety protection measures to deal with dangerous situations to ensure personnel safety.
在雨天和大風(fēng)天氣,應(yīng)暫停加工棚的搭設(shè)和拆除,并檢查和維護(hù)加工棚的質(zhì)量。加工棚搭設(shè)完成后,經(jīng)專職員驗(yàn)收合格后方可投入使用。在搭設(shè)和拆除水平防護(hù)前,進(jìn)行技術(shù)交底。更多相關(guān)內(nèi)容就來(lái)我們網(wǎng)站http://m.cannablisscreamery.com咨詢!
In rainy and windy weather, the erection and removal of the processing shed shall be suspended, and the quality of the processing shed shall be inspected and maintained. After the erection of the processing shed is completed, it can only be put into use after being accepted by the full-time safety officer. Before erecting and removing horizontal protection, safety technical disclosure shall be carried out. Come to our website for more relevant content http://m.cannablisscreamery.com consulting service